Home Page Sites
 
Home
Help
Search
Sitemap
    Tel: 020 7732 3925     Fax: 020 7732 7896     Email: info@pre-construct.com
About PCA Contact PCA Services Departments Sites News Publications Careers
 

London Office Site

Back

South East Coastal Strategy Pipeline, Pipe Section 2
ST (see Carew 1999); Tim Carew; Evaluation; 9th - 26th June 1999; Dwr Cymru / Welsh Water; WWTW99

This section of the pipeline was observed through watching briefs. No significant archaeological features were found.

Alluvium was excavated to the maximum required depth of 2.2m from the surface levels of between 6.95m - 7.35m OD.


Search the web
Search www.pre-construct.com

Sites Main Page

Browse PCA Sites by:

Site Name
Date
Borough (London)
County


Privacy Policy
Disclaimer
© Copyright Pre-Construct Archaeology Ltd 2004-2009 Top of Page